top of page


GWS-018 — Waterproofing Testing: What Should Be Checked Before Handover?
The Guardian – Chief Technical Advisor, GUGAFIX® Construction Chemicals Introduction Waterproofing should not be considered complete simply because the material has been applied and the surface looks finished. Before an area is handed over for the next stage of construction—or to the building owner—it should be appropriately inspected and, where required, tested. Testing provides an opportunity to identify leakage, drainage problems, incomplete detailing or other defects bef
Propack Corporation
Oct 276 min read


GWS-016 — Waterproofing Over Concrete: Surface Preparation & Moisture Considerations
The Guardian – Chief Technical Advisor, GUGAFIX® Construction Chemicals Introduction Waterproofing is often covered soon after application. Tiles are installed. Screed is placed. Soil is backfilled. Finishes are completed. Once that happens, much of the waterproofing system becomes difficult—or impossible—to inspect. That makes the inspection stage extremely important. Before waterproofing is covered, the site team should verify that the system has been properly applied, crit
Propack Corporation
Oct 276 min read
bottom of page
