GWS-016 — Waterproofing Over Concrete: Surface Preparation & Moisture Considerations
The Guardian – Chief Technical Advisor, GUGAFIX® Construction Chemicals Introduction Waterproofing is often covered soon after application. Tiles are installed. Screed is placed. Soil is backfilled. Finishes are completed. Once that happens, much of the waterproofing system becomes difficult—or impossible—to inspect. That makes the inspection stage extremely important. Before waterproofing is covered, the site team should verify that the system has been properly applied, crit
Propack Corporation
Oct 276 min read