GWS-018 — Waterproofing Testing: What Should Be Checked Before Handover?
The Guardian – Chief Technical Advisor, GUGAFIX® Construction Chemicals Introduction Waterproofing should not be considered complete simply because the material has been applied and the surface looks finished. Before an area is handed over for the next stage of construction—or to the building owner—it should be appropriately inspected and, where required, tested. Testing provides an opportunity to identify leakage, drainage problems, incomplete detailing or other defects bef
Propack Corporation
Oct 276 min read