top of page


GWS-019 — 15 Common Waterproofing Mistakes on Construction Sites
By The Guardian – Chief Technical Advisor, GUGAFIX® Construction Chemicals Waterproofing rarely fails because someone simply forgot to apply a waterproofing material. More often, failure develops through a chain of small mistakes—poor surface preparation, untreated cracks, inadequate detailing, incorrect mixing, insufficient thickness, damaged waterproofing, poor drainage, or failure to inspect before covering the work. A waterproofing system is only as reliable as its weakes
Propack Corporation
Oct 286 min read


GWS-006 — Flexible vs Rigid Waterproofing: When Should You Use Each?
By The Guardian – Chief Technical Advisor, GUGAFIX® Construction Chemicals Introduction One of the most common questions in waterproofing is: “Should I use flexible waterproofing or rigid waterproofing?” The answer is not simply flexible is better or rigid is better. Both approaches have their place. The correct choice depends on the substrate, movement, water exposure, crack characteristics, application area, detailing and subsequent construction layers. A waterproofing syst
Propack Corporation
Oct 166 min read


GWS-004 — How to Choose the Right Waterproofing System for a Building
By The Guardian – Chief Technical Advisor, GUGAFIX® Construction Chemicals Introduction One of the most common mistakes in waterproofing is starting with the material instead of the problem. A contractor may ask: “Which waterproofing product should I use?” But the better question is: “What waterproofing system is suitable for this particular application?” A terrace, bathroom, balcony, basement, water tank and foundation do not experience water in the same way. Some areas face
Propack Corporation
Oct 166 min read


GWS-003 — Why Waterproofing Fails: 10 Common Causes of Leakage
By The Guardian – Chief Technical Advisor, GUGAFIX® Construction Chemicals Introduction Waterproofing is intended to protect a building from unwanted water penetration. Yet leakage continues to be one of the most common complaints after construction. A terrace starts leaking during the monsoon.A bathroom develops damp patches below the floor.Water appears around a pipe penetration.A basement wall becomes damp.A balcony develops leakage despite having been "waterproofed." The
Propack Corporation
Oct 165 min read
bottom of page
